I've been slacking on the writeups in the past month or so especially considering this has been the most exciting month of the whole project, but it's been so busy and stressful I just haven't had much time to sit down and write. I'll get into a few more details but in a nutshell, Velorum was hauled, launched, and sailed.
Rolling back to mid June, I was in full on stress mode trying to get the hauler to commit to a specific date (24th) and getting the boat ready for the road. This entailed removed the pulpit on the bow and all of the lifelines I had just built up so the boat would be under the height limit (I think 12') when on the road. I knew this needed to be done before I built the lifelines, but it was annoying to have to take things apart that I spent so much time putting together. Such is life.
I finally got word on the 22nd that the truck would be there to pick the boat up on the 24th, so I called a few friends who could skip out of work for a few hours to help me load the mast onto the truck (the hauling company explicitly said that they do not load masts themselves and I would need help). The driver called me the night before and said he would be there around 9AM, but he didn't actually show up until 10:30 or so because of traffic. I felt bad because my co-workers took time out of their day to help, but ended up sitting around for quite a while.

The whole process of loading a boat onto a truck seems very unnatural to me and it was super stressful to watch but after about an hour or so, the boat was on the trailer with the mast on the side rack and ready for the trip down to Mattapoisett MA. I watched the boat drive off and decided that I would not follow the boat down to watch it get unloaded and just trusted that it would all get done. Sometimes it's best not to see how the sausage is made.
The next day I headed down to Mattapoisett Boatyard to spend a few days getting her ready and found the boat had arrived in one piece and happily with no damage. I found a spare ladder, climbed aboard and got to work. The first thing I did was reinstall the pulpit and lifelines and get the navigation red/green light wired on the pulpit (I had run the wire earlier this spring, but never installed it knowing that I would just have to take it apart for the trip).
Next up was rigging the mast. I installed the windvane, windex, and lightning arrestor on the masthead and then replaced the rope chasers with all the actual halyards before turning to the standing rigging. This was one of the biggest sources of stress for me because the new rigging I built the previous summer (
here) was up until this point theoretical. I didn't really know if everything would fit even though I checked and re-checked my measurements about a hundred times when I put it all together.
I attached the six shrouds (2 lowers and 1 upper per side) and then re-assembled the profurl roller furler and attached the forestay. At this point I bundled up all the shrouds and loosely tied them off to the mast near the partner in preparation for stepping the mast. I stopped in at the yard office and said I thought I was ready to step the mast and 15 minutes later the riggers and a boom truck showed up. It's worth noting here that the crew at
Mattapoisett Boatyard are so accommodating and patient. When I contracted with them earlier in the year, they said they could help as much or as little as I wanted when getting the boat ready to go. I chose to do most of the work myself except for the actual step and when I said I was ready, they swarmed into action.
Earlier I said that it seemed unnatural to see a boat loaded onto a trailer; well, stepping a mast takes it to another level. Seeing a 250lb mast with wires everywhere suspended above your boat with nothing more than a strap is not for the faint of heart. Fortunately, all went well other than a minor adjustment of one of the shrouds that should have gone forward of the spreaders instead of behind them. They spotted my mistake before they even got it off the ground. Once ready, they picked it up with the boom truck, dropped it into place and started attaching all the rigging. Amazingly, my measurements were spot on and everything attached perfectly.
The only piece of rigging that wasn't finished was the backstay because I couldn't get an accurate measurement from the old rigging so I put the stalok fitting on the top so I could attach it to the mast and then I cut it about 2 feet long so once the mast was stepped I could cut it to final length. With the mast in place and all the shrouds and forestay attached the crew helped me stretch the backstay aft and we estimated the length needed. They gave me a few minutes to cut it and assemble the bottom stalok fitting before we locked it onto the backstay chainplate. They did a quick tune of the rig and everything checked out great (they commented on how well it had gone and that the mast went into column perfectly). What a relief. After that drama was over I was able to install the boom and get the rest of the running rigging and dodger setup.
The last thing I needed to do before launch was get the engine started. I had run the engine back in Canterbury after finishing up the installation, but I thought it would be a good idea to double check in case something had rattled loose during transport. It fired right up with no issues so I gave the yard the go ahead to launch the boat.
Unfortunately, the tide was too low to launch that day and I was out of time and had to get back to work so I had to wait until the following week and take a day off work to get the boat launched. Steph and I showed up the following Tuesday (6/30) and let them know I was ready to go. 10 minutes later they had the boat in the travel lift slings and the boat was hanging over the water (this was clearly not their first rodeo).
They lowered the boat in and had me step aboard to check all the seacocks and make sure there were no leaks. While still in the slings I started up the engine and let it run for a few minutes and then they fully dropped the slings and sent me off into the harbor to pick up a mooring. Somehow all of this was drama free and everything seemed about right.
Steph and I spent a few hours out on the boat cleaning things up and checking systems before heading back on the launch. The first sail would have to wait until the weekend, but this was the milestone I had been working towards for 2.5 years. Most of the work was over (it's never really over) and now it was time to get to know the boat.